Knowledge quiz

It's time to put what you've learned to the test, get 8 right to pass this unit.

1.

What options do you have when defining a status profile?

There are two correct answers.
2.

For which processes can you set the time of processing via the Process Control key?

There are two correct answers.
3.

What can you specify in a production scheduling profile?

There are two correct answers.
4.

Which information and control settings can be defined in the configuration activity Specify Scheduling Parameters?

There are two correct answers.
5.

What details can be defined in a confirmation profile for process orders?

There are two correct answers.
6.

If you have assigned a production scheduling profile to both the material and the production supervisor, which production scheduling profile is copied into an order? 

Choose the correct answer.
7.

Which are the main steps in process order processing?

There are two correct answers.
8.

What is a prerequisite for being able to use a status profile in a process order?

Choose the correct answer.
9.

Why do you perform availability checks for process orders?

There are two correct answers.
10.

Which options can you activate via indicators in the confirmation parameters?

There are two correct answers.