Controlling Object Cost
Controlling Product Cost by Period
Controlling Product Cost by Period for Period-End Closing
Controlling Product Cost by Orde
Controlling Product Cost by Order for Period-End Closing
Exploring Sales-Order-Related Production Scenarios in Cost Object Controlling
Controlling Product Cost by Sales Order with Production
Configuring Product Cost Controlling by Sales Order
Controlling Product Cost by Sales Order for Period-End Closing
Controlling Product Cost by Sales Order without Production (Service)
Understanding Information Systems for Product Cost Controlling

Knowledge quiz

It's time to put what you've learned to the test, get 8 right to pass this unit.

1.

Which function is used to settle actual costs of co-products in Product Cost by order?

Choose the correct answer.
2.

The allocation structure contains all cost elements with which the __________can be debited.

Choose the correct answer.
3.

When the order is delivered and settled, the order balance is reduced to zero by transferring the difference between the __________ and the value of the delivery to stock to Financial Accounting.

Choose the correct answer.
4.

The settlement profile allows either proportional settlement (Equivalence Number indicator), or percentage settlement (%-Settlement indicator).

Choose the correct answer.
5.

If the price control indicator is set to S, the system:

Choose the correct answer.
6.

The order balance is always interpreted as a variance for:

Choose the correct answer.
7.

In which of the following cases can you not determine work in process of a manufacturing order, including the co-products?

Choose the correct answer.
8.

If you use Product Cost by Period without the product cost collector, which of the following settings are needed?

There are two correct answers.
9.

How is work in process (WIP) calculated?

Choose the correct answer.
10.

If the debit of the order item is less than the credit, what does the system do?