Knowledge quiz

It's time to put what you've learned to the test, get 6 right to pass this unit.

1.

Which of the following statements related to target costs are correct?

There are two correct answers.
2.

When operation 0020 – Assembly is completed, entering the actual values in the Confirm Repetitive Manufacturing app using the Assembly Backflush method triggers an automatic goods issue for the raw materials and a goods receipt for the S11-000 Handlebar.

Choose the correct answer.
3.

When operation 0010 – Cropping and Forming is completed, the actual values are entered in the Confirm Repetitive Manufacturing app using the Assembly Backflush method. Only the actual activity quantities of the Machine and Labor activity need to be entered because they differ from the default values in the routing.

Choose the correct answer.
4.

Which of the following statements related to target costs are correct?

There are two correct answers.
5.

The Target Costs are calculated using the actual cost rates, which are stored in the database for reference.

Choose the correct answer.
6.

In our Handlebar production scenario, when operation 0010 – Cropping is completed, the Confirm Repetitive Manufacturing app does not require any manual entry of actual activity quantities for Machine and Labor activities, as these are automatically calculated and populated based on the default values.

Choose the correct answer.
7.

Which of the following two statements related to target costs is correct?

Choose the correct answer.