Knowledge quiz

It's time to put what you've learned to the test, get 8 right to pass this unit.

1.

Which are the two ways to confirm the warehouse task in Kanban processing?

There are two correct answers.
2.

Which documents are being posted synchronously in the material document in terms of the Warehouse Goods Receipt from Repetitive Manufacturing (41U) scope item?

There are two correct answers.
3.

Which procedure needs to be done to start the work on the production order?

Choose the correct answer.
4.

How is consumption posting initiated for components in SAP Warehouse Advanced Production Integration when backflushing is not enabled?

Choose the correct answer.
5.

Which warehouse management method in SAP Warehouse Advanced Production Integration combines products from multiple Production Material Requests (PMRs) into a single warehouse task for transport to the Production Supply Area (PSA)?

Choose the correct answer.
6.

Which document is NOT required in the process "Warehouse Production Integration with Synchronous Goods Receipt"?

Choose the correct answer.
7.

What are some of the process steps of the Goods Receipt from Production process?

There are three correct answers.
8.

Which SAP S/4HANA business roles are used in the Delivery-Based Production Integration scenario?

There are three correct answers.
9.

What is the main document for the material staging process in Warehouse Production Integration?

Choose the correct answer.