OM is integrated with PA so that the Organizational Assignmentinfotype is filled with data from OM when integration is active. Consequently, some of the infotype fields are no longer ready for input in the Maintain HR Master Data transaction.
Personnel Administration (PA)
Persons are objects that hold positions in an organizational structure. PA maintains person-related data. The integration of PA with OM enables you to automate some of the maintenance tasks.
Organizational Assignment

If integration is active and a person is assigned to a position in HR master data, the objects linked with the position in HR master data are written to the Organizational Assignment infotype. If integration is active, the Organizational Unit, Job, and Cost Centerfields are not ready for input, but are filled in the Organizational Management infotype (IT0001) exclusively from OM.
In addition, every organizational change is stored in both the Organizational Assignment infotype in HR master data and the organizational plan in OM. This means that if a change made in OM affects the organizational assignment of a person, then the change in the HR master data is written to the Organizational Assignment infotype. Similarly, a change made to a person’s organizational assignment (for example, as a result of a personnel action) in HR master data is updated in OM.
Basic Integration Settings
The PLOGI feature is used to decide the employees that are taken into account for integration between OM and PA.
You must first set the integration plan version in the PLOGI PLOGI entry in table T77S0. If you do not define an integration plan version, integration is not active. You then specify the employees that need to be involved in integration. To do this, maintain the PLOGI feature.
You can form groupings according to the following criteria:
- Country grouping
- Company code
- Personnel area
- Personnel subarea
- Employee group
- Employee subgroup
Enter X in the Value abbr field of table T77S0 to activate participation in integration. If there is to be no integration, leave the field blank.
If you activate the PLOGI ORGA switch in T77S0 by entering X, you also activate integration between the PA and Personnel Planning components as a whole. PLOGI ORGA is the main integration switch. This switch enables PA and the organizational plan to remain consistent.
Additional Integration Settings
Examples of integration settings for the Group PLOGI include the following settings:
- PLOGI EVENB:
- If you set the PLOGI EVENB switch to X, you can move a person, position, or organizational unit within an organizational structure, if this change also requires a change in the company code for the affected person(s).
- PLOGI PRELI:
- If an employee has not been assigned to a position in the integrated system, you can use the default value contained in PLOGI PRELI.
- PPABT PPABT:
- If you use the department switch PPABT PPABT, you can activate the inclusion of the Department indicator in infotype 1003 for integration.
The following table lists the results received when you enter different values for PLOGI PRELU:
| Value | Result |
|---|---|
| BTCI | The changes in OM are not updated immediately in PA (Organizational Assignment infotype 0001). The personnel numbers affected by the change are collected before the new information is updated by a batch input later. |
| " " or "0" | The update (between OM and PA) takes place immediately. |
| A numeric value | The system first determines how many personnel numbers are affected for each action in OM. If this number exceeds the numeric value, the same applies as for entry BTCI, or alternatively, as for entries " " or "0". |
