Updating an SAP Solution Manager ABAP System using SUM, Strategy Single System

Knowledge quiz

It's time to put what you've learned to the test, get 3 right to pass this unit.

1.

What is one of the first steps you should consider before updating an AS ABAP-based SAP system using SUM?

Choose the correct answer.
2.

Immediately after a new installation, all ABAP programs are available as source code including their load.

Choose the correct answer.
3.

You use the SAP Load Generator to generate loads in your SAP system which consists of applications servers running on Linux and another Unix operating system. To generate all selected loads for all application servers, you need to start the load generation more than once.

Choose the correct answer.