Introducing Make-to-Stock – Process Manufacturing Based on Process Order (BJ8)

Objectives
After completing this lesson, you will be able to:

After completing this lesson, you will be able to:

  • Introduce make-to-stock – process manufacturing based on process order (BJ8)

Introduction to Make-to-Stock – Process Manufacturing Based on Process Orders (BJ8)

How to Access SAP S/4HANA Cloud, public edition Scope Item Process Flows and Test Scripts

  1. Navigate to SAP Best Practices for SAP S/4HANA Cloud, public edition for Enterprise Management.
  2. Select a country localization from the Version dropdown list.
  3. If necessary, select the Login icon in the upper left corner to log in.
  4. Go to the Accelerators section and, under General Documents, click the link SAP Best Practices content library.
  5. Select the relevant scope option checkboxes to filter information and locate scope item test scripts and process flows.
Note
Ignore the BPMN2 version of process flows.

Description

This scope item enables production planning in make-to-stock scenarios and quick reactions to incoming sales orders. The focus is on process manufacturing (for example, supported through process orders or batch management). The process starts with the creation of a demand forecast for finished goods represented by planned independent requirements (PIRs). Based on PIRs, Material Requirements Planning (MRP) creates a production plan for finished goods, semi finished components, and raw materials. Production planners can analyze and change the planned-order-based production plan manually. Raw material demand leads to purchase requisitions that trigger alternative procurement scenarios referenced in this scope item. The production process itself is entirely covered via conversion of planned into process orders, order release, direct material issue or backflush, confirmation of operations and goods receipt posting. Order-based target and actual costs are created, ensuring fully integrated material and value streams.

Key Process Steps

Key process steps of Make-to-Stock - Process Manufacturing Based on Process Order (BJ8) include:

  • Process planned independent requirements
  • Perform material requirements planning and evaluation of stock requirement list
  • Create process order, material staging, order confirmation, material movement postings for goods issue and goods receipt in production order processing
  • Run scrap reports optionally after production

Benefits

Benefits of Make-to-Stock - Process Manufacturing Based on Process Order (BJ8) include:

  • Support of management of batch-oriented process manufacturing
  • Order-based target and actual costs management, ensuring fully integrated material and value streams

Save progress to your learning plan by logging in or creating an account

Login or Register