Configuring Product Change Management with Change Records- Discrete Industries

Objectives
After completing this lesson, you will be able to:

After completing this lesson, you will be able to:

  • Configure product change management with change records - discrete industries

Master Data for Product Change Management with Change Records- Discrete Industries

Required Master Data Scripts

To run this process you need the following master data:

  • Change Record

  • Material

  • Bill of Material

Create Multi Level Bill of Materials

  • Open the Maintain Bill Of Material - Create, change, and display BOMs (F1813) app
  • Choose Create BOM
  • Make the following entries: For ex: Material: CM-FL-V01/Plant: 1010/BOM Usage: 1
  • Add required components as BOM items
  • Assign respective dependencies to BOM items