Process Overview: Introduction to Engineering Products and Systems - Project with Production
Please open SAP Process Navigator https://me.sap.com/processnaviagtorto get in insight inside scope item 6GD process flow.
Sales order processing of project WBS stock product planning is enabled with the availability check using subordinate WBS elements with project revenue reporting and project cost report, with supporting project production orders.
On the logistical side, the project user interface is used to create and maintain material requirements such as planning and long lead time early material (internal or external) procurement. You can also provide material requirements directly to the project using project production orders supported by normal stock components manufactured by subcontract vendors
Benefits
This process helps you to:
Confirm sales order delivery date to customer
Get greater granularity of the project manufacturing cost
Improve operational efficiency Improve customer delivery rates
Key Process Steps Covered
- Perform sales and delivery availability checks
- Use subordinate WBS elements with Sales Order Item Free of Charge item category
- Use the project UI to plan and maintain items with long lead times only within project UI
- Monitor project order cost reports during project cycle
- Create and monitor project direct reservations