Inspecting During Production with Sample Management
Creating Basic Data in SAP S/4HANA Quality Management
Enhancing the Material Master
45 mins
Setting up Sample Determination
45 mins
Setting up Dynamic Modification
25 mins
Setting up Master Inspection Characteristics
35 mins
Setting up Code Groups and Codes
20 mins
Setting up Selected Sets
30 mins
Quiz
Setting up Inspection Plans in SAP S/4HANA Quality Management
Configuring Quality Inspections in SAP S/4HANA Quality Management
Configuring Quality Notifications in SAP S/4HANA Quality Management
Recording Costs in SAP S/4HANA Quality Management
Processing Quality Inspection at Goods Receipt
Performing Quality Inspection at Goods Receipt
30 mins
Describing the Required Master Data
30 mins
Explaining the Lifecycle of an Inspection Lot
30 mins
Quiz
Processing Inspection Lots with Stock in Quality Inspection
Implementing Quality Control in Procurement
Implementing Quality Control in Procurement
45 mins
Quiz
Using Quality-Related Procurement Documents
Processing Quality Certificates at Goods Receipt
Describing Quality Management in Sales and Distribution
Describing Quality Management in Sales and Distribution
15 mins
Quiz
Maintaining Master Data for Outbound Delivery Inspections
Execution of Quality Inspections for Outbound Delivery
Recording Defects for an Order
Describing Defects Recording for an Order
15 mins
Maintaining Master Data for Defect Recording
15 mins
Using an Inspection Lot for Defect Recoding for a Production Order
20 mins
Executing Defects Recording Using the Inspection Lot for the Production Order
20 mins
Executing Defects Recoding Using the Production Defect
20 mins
Quiz
Recording Inspection Results for an Order
Performing Inspection at the End of the Production Process
Describing Technical Settings for Inspection Processing With Orders
Inspecting During Production with Free Inspection Points
Introducing In-Process Inspections with Inspection Points
30 mins
Maintaining Master Data for Multiple Results Recording with Free Inspection Points
85 mins
Creating and Releasing a Production Order for Results Recording with Free Inspection Points
15 mins
Recording Inspection Results for an Inspection Lot during Production with Free Inspection Points
20 mins
Quiz
Inspecting During Production with Sample Management
Knowledge quiz
It's time to put what you've learned to the test, get 8 right to pass this unit.
1.
What is the purpose of assigning a Sample-Drawing Procedure to a task list?
There are two correct answers.
To identify samples based on unique keys
To record inspection results for samples
To plan the drawing of samples
To manage sample data in the SAP S/4HANA system
2.
What is the main reference object to which inspection results are recorded in Sample Management?
Choose the correct answer.
Inspection characteristic
Inspection lot
Physical sample
Sample record
3.
Which of the following options are available for sample drawing in production?
There are two correct answers.
Planning a sample drawing so that the samples are automatically created when an inspection lot is created.
Draw samples for inspection characteristics.
Draw samples manually on the basis of time and quantity.
Draw samples for operations
4.
What is a sample-drawing item?
There are two correct answers.
A container type used for storing samples.
A specific instruction for drawing samples from different container types.
A specific instruction on how many samples should be created for a material.
A calculation method for determining the number of samples.
5.
Which of the following inspection point identifier fields are mandatory?
Choose the correct answer.
Date
Sample number
Time
Inspector qualification
6.
When using preplanned samples, how are the samples created?
Choose the correct answer.
Manually during production
Automatically when an inspection lot is created
Automatically when the order is created
During results recording
7.
Which is the correct process sequence for results recording with samples?
Choose the correct answer.
Inspection result recording, sample valuation, characteristic valuation
Inspection result recording, characteristic valuation, sample valuation
Sample valuation, inspection result recording, characteristic valuation
8.
Which is the correct process step sequence when executing sample management in production?
Choose the correct answer.
1) Create sample, 2) Assign a sample-drawing procedure to the task list, 3) Create inspection lot, 4) Record inspection results, 5) Valuate each sample
1) Assign a sample-drawing procedure to the task list, 2) Create inspection lot, 3) Create sample records, 4) Record inspection results, 5) Valuate each sample
1) Assign a sample-drawing procedure to the task list, 2) Create inspection lot, 3) Create sample records, 4) Valuate each sample, 5) Record inspection results
9.
What is a mandatory step before you can record results for an additional, unplanned sample?
Choose the correct answer.
Manually create the sample with reference to the inspection lot.
Record the results for the planned samples first.
Terminate the inspection lot processing by making a usage decision.
Confirm the drawing of the planned samples first.
10.
To which level of the task list do you assign a sample-drawing procedure?
Choose the correct answer.
Header
Operation
Inspection characteristic