Knowledge quiz

It's time to put what you've learned to the test, get 8 right to pass this unit.

1.

In the material master, what is a prerequisite for the creation of an inspection lot for a production order?

Choose the correct answer.
2.

Which of the following settings can you enable in an inspection type for in-process inspections?

There are three correct answers.
3.

What is the purpose of the generic defect category?

Choose the correct answer.
4.

Which of the following elements are available for a defect?

There are three correct answers.
5.

How can you differentiate between in-process inspections in discrete production and in-process inspections in process production?

Choose the correct answer.
6.

To which of the following elements of an inspection lot can you record defects against?

There are three correct answers.
7.

What is the minimum master data required if you want to record defects for inspection lots?

Choose the correct answer.
8.

What is the purpose of goods receipt inspections?

Choose the correct answer.
9.

What is the inspection lot origin that you use in production in the combination with defects recording?

Choose the correct answer.
10.

Where can you configure that the production order is automatically released?

Choose the correct answer.