Note
Instead of releasing the entire order, you can also sequentially release individual operations of an order. If characteristics are only to be created for released operations, you can set the Late Characteristic Creation indicator in Customizing under Quality Management → Basic Settings → Maintain Settings at Client Level, Further Settings). This allows a more flexible inspection during production.If dynamic modification criteria are defined for the task list and/or inspection lot origin, the system checks the existing quality level for the material (and the other criteria, if applicable):
If a quality level is not available, the system creates one.
If the dynamic modification rule specifies that the quality level must be updated when the usage decision is made, the system does not update the quality level now.
If the dynamic modification rule specifies that the quality level must be updated when an inspection lot is created, the system updates the quality level now.
The system calculates the sample size. If the sample calculation must be triggered manually (controlled by the inspection setup in the material master), you must call up the inspection lot in change mode and trigger the sample calculation manually.
Note
Refer to the SAP Application Documentation for additional information about the integration of inspection lots with production orders.
Refer to the SAP Application Documentation for additional information about the integration of inspection lots with process orders.