Implementation Steps of Best Practice Solution for Payroll Control Center
Let's take a closer look at the system preparation stage. The graphic below shows a big picture overview of all activities for PCC. First, you’ll prepare to configure PCC. Then, you’ll configure PCC, and finally you can launch it. All steps will be detailed in the upcoming units.

System Preparation in Upcoming Course Units
There are several steps required for preparing your clients’ system for PCC.
- In this unit, we will highlight some important points regarding applying and adjusting best practice.
- You will learn the details of system preparation in Unit Configuring Payroll Control Center.
- Declustering settings and the features of storing payroll results in declustered tables will be covered in detail in the unit for Using Payroll Control Center Tools.
- You will work with variants for payroll drivers, payroll posting, and bank transfers in units Performing Continuous Payroll With PCC, Running PCC Production, and unit Setting up and running off-cycle payroll process configuration.

Import Transport
Typically, import transport tasks are performed by technical administrators rather than technical consultants. In any case, all the necessary information about the relevant note, file name, required authorization, and step-by-step instructions can be found by following the link to the corresponding section of the SAP Library.

How to Apply the SAP Best Practices Configuration in the System | SAP Help Portal