The measurements are taken at a voltage level that is lower than the network access, and energy losses have to be considered.
Besides a real device, a device info record that contains a given loss factor is used here.
Objectives
The measurements are taken at a voltage level that is lower than the network access, and energy losses have to be considered.
Besides a real device, a device info record that contains a given loss factor is used here.
By adding up all the meter values from several MeLo installations, a total measurement is determined at the MaLo installation. Here, we use two devices, which means that two MeLo installations are necessary to describe the following set ups.
In serial switching, a primary meter and one or more secondary meters exist. We use only one secondary meter to describe the serial switching in this chapter.