Knowledge quiz

It’s time to put what you’ve learned to the test, get 8 questions right to pass this unit.

1.

You can create parallel sequences in which of the following task lists?

There are two correct answers.
2.

You can use a scheduling margin key to define the floats before and after production in the material master record.

Choose the correct answer.
3.

The system can carry out reduction measures in _____________ scheduling for orders.

Choose the correct answer.
4.

When you display change master changes inside your routing, what kind of display options are available?

Choose the correct answer.
5.

Which of the following are possible reasons for alternative production methods?

Choose the correct answer.
6.

Which of the following can you assign to an operation in a reference operation set?

Choose the correct answer.
7.

A reference operation set allows for parallel and alternative sequences.

Choose the correct answer.
8.

If material requirements planning (MRP) is carried out without lead-time scheduling, it calculates capacity requirements.

Choose the correct answer.
9.

In the simplest case, a routing has one sequence, the __________ sequence.

Choose the correct answer.
10.

Which of the following is the main reason for an alternative production method being required for different production lots?

Choose the correct answer.