Knowledge quiz

It's time to put what you've learned to the test, get 8 right to pass this unit.

1.

Which of the following is a method of creating routing material assignments?

There are two correct answers.
2.

You can store __________ production version(s) for different lot size intervals in the material master.

Choose the correct answer.
3.

Which master data are part of a production version?

There are two correct answers.
4.

Suboperations can be used for more detailed capacity planning and costing.

Choose the correct answer.
5.

Which of the following controls the engineering workbench (EWB)?

Choose the correct answer.
6.

PRT is another name for a component that is used in production.

Choose the correct answer.
7.

You can assign each item in the bill of material (BOM) to only one operation in the routing.

Choose the correct answer.
8.

Which of the following is not a prerequisite for component allocation?

There are two correct answers.
9.

A where-used list can show you the task lists that will be affected by a change in a work center.

Choose the correct answer.
10.

Inside your SAP system, you can assign various production resource tools to an operation in a routing.

Choose the correct answer.

Log in to track your progress & complete quizzes