Explaining Material Cost Estimates with Quantity Structure
Summarizing the Basics of Product Cost Planning
Explaining Cost Estimates and Their Purpose
20 mins
Identifying and Integrating Material Master Data in Product Cost Planning
10 mins
Introducing Quantity Structure and Value Structure
10 mins
Identifying Costing Items in Cost Estimates
10 mins
Quiz
Explaining Material Cost Estimates with Quantity Structure
Describing the Quantity Structure
Comprehending the Cost Estimate with Quantity Structure
Analyzing Cost Estimates and Updating Standard Prices in Material Master records
Identifying the Different Production Scenarios and their Prerequisites
Identifying the different business needs of analysis in Production Accounting
3 mins
Considering the Lot-Based Production (Make-To-Stock Scenario)
3 mins
Considering the Repetitive Production (Make-To-Stock Scenario)
3 mins
Considering the Sales-Order-Related Production (Make-To-Order Scenario)
3 mins
Considering the Project-Related Production (Engineer-To-Order Scenario)
3 mins
Quiz
Outlining the Correspondence between Production Scenarios, Controlling Objects, and Master Data
Outlining the MTS Production Process Steps and their Depiction in Production Accounting by Production Order
Knowledge quiz
It's time to put what you've learned to the test, get 7 right to pass this unit.
1.
To display a cost estimate with a quantity structure in the Display Material Cost Estimates Fiori app, what must you specify?
There are three correct answers.
Material
Plant
Supplier
Costing Variant
2.
What is the purpose of the valuation variant in a costing variant?
Choose the correct answer.
Determines the purpose of the costing.
Specifies how materials, activities, and processes are valued.
Sets the valid dates for cost estimates.
Indicates the plant location.
3.
Which button can you choose to display the costing variant information in the Explanation facilities window of the Display Material Cost Estimate app?
Choose the correct answer.
Information on Cost Estimate
Costing Variant
Costing sheet
4.
What analysis type can be performed using the lower part of the Display Material Cost Estimates app screen?
Choose the correct answer.
Error Log Analysis
Date Validation
BOM Structure Overview
Deeper analysis like Itemization, Cost Components, or Costed Multilevel BOM.
5.
Which section of the Display Material Cost Estimates app provides a hierarchical breakdown of costs associated with producing a material?
Choose the correct answer.
Header Section
Costing Structure
Valuation Tab
Costs Tab
6.
What is the primary purpose of the Information on Cost Estimate button in the cost estimate screen?
Choose the correct answer.
To delete obsolete cost estimates.
To provide explanation facilities for the cost planner.
To export cost estimates to spreadsheets.
To access customer-related data.
7.
What impacts the unit cost when creating a cost estimate if the lot size field is blank?
Choose the correct answer.
Costing Variant
Material Master Lot Size
Valuation Method
Header Section Information
8.
Which tab in the header section of the Display Material Cost Estimates app allows you to view the Cost Component View including COGM and COGS?
Choose the correct answer.
Costing Data
Dates
Quantity Structure
Costs