It’s time to put what you’ve learned to the test, get 5 questions right to pass this unit.
1.
You have chosen that SLT should be kept active during the bridge runtime. For which tables do you have to perform an initial load using the SLT cockpit after the restart as part of the ramp-up activities?
There are three correct answers.
2.
How can a ZDO update or upgrade be reset?
Choose the correct answer.
3.
During the configuration steps in phase SUMASK_ZDO_CONFIGURATION the flag "Yes, request the backup" was set. When will Software Update Manager stop and ask to take a system backup?
Choose the correct answer.
4.
Which aspects can be investigated with the load verification of the bridge subsystem?
There are three correct answers.
5.
How much buffer should be used when calculating the productive bridge runtime?
Choose the correct answer.
6.
Which aspects can be investigated with the functional validation of the bridge subsystem?