Overview of Order-Based Supply Planning

Objective

After completing this lesson, you will be able to describe the Basics of Supply Planning Run

Overview of SAP IBP OBP Business Planning Processes

The four main planning processes include Supply and Allocation Creation, Response Planning, Deployment Planning, and Transportation Load Building. Each of these planning processes can be executed by a planning run. Some customers execute deployment planning, or may just execute Supply and Allocation creation and pass on the allocations to either SAP APO GATP or SAP S/4Hana for advanced ATP. Order-Based Planning is very flexible, and a customer could use one of the processes or all four processes depending on business requirements.

Supply and Allocation creation generates Allocations. Allocations could be defined as a "cap" that sets how much product a customer could get in a certain time bucket. The additional requested quantity (over the threshold) spills over to the next period. This planning process also creates a regular supply plan along with the allocations.

During response planning, supply is created, and the allocations if set as a constraint, are consumed. Moreover, this process creates sales order confirmations. If we have a material requirements date, and for some reason, if we cannot meet that date, we can show it as late or partially late, and using Real Time Integration (RTI) we can send the updated demand element back to ERP indicating that the sales order cannot be met fully on time, and here is the best availability date.

Deployment planning creates a short-term deployment plan, pushing or pulling product downstream depending upon the demand elements. Stock Transfer Requisitions (STRs) are changed to Deployed Stock Transfer Requisitions (DSTRs).

Transportation load building (TLB) enables grouping planned distribution receipts into optimized transportation loads and best uses the transportation equipment.

The process relies on the output of the Order-Based Planning: Transportation Load Building (with Profile) application job, also called the TLB run. The jobs use a cost-based load optimization algorithm that considers different equipment types and their upper limits in various units of measure to create transportation loads. The loads can then be reviewed and eventually fully re-planned if needed. Loads are integrated as multi-item requisitions to SAP ERP or SAP S/4HANA using Real-Time Integration.

An overview of each process is presented in this section.

The figure describes the Key Process Supported in Order-Based Planning.

An overview of the Operational Supply Planning Flow is presented in Figure below.

The figure describes the Operational Supply Planning Flows.

Scope Comparison SAPIBP2 vs. SAP7F

The functional scope of SAPIBP2 for Order-Based, as it will be shipped for release 2508, is shown in the figure below.

Inclusions and Exclusions

In addition to the previously discussed innovations in the production model (one key for PDSID), using activity as a key in the PDSRESOURCE, using order key figures, different attribute lengths, and using the new concept of the UoM for key figures and for capacity consumption, there are a few model changes in SAPIBP2 that are pertinent to order-based planning.

The figure describes the Differences for the SAP7F / SAPIBP2 - Model Changes.

Sales Order Confirmation

In the Supply Chain, conditions are always changing. You get a big order from a customer for next week, which was not considered in the forecast, or changes can arise from the execution side, for example, a capacity shortage.

When changes happen, you may want to simulate, for example, what happens if you allocate more material to your important customer, or maybe the impact of adding one more shift to the factory to increase the capacity. By doing such a simulation, you could find out if more sales orders could be satisfied.

An effective response management solution enables the organization to determine the best course of action in those scenarios. Therefore, response planning is a supply solution with a short-term horizon. Response Planning adjusts the supply plan to respond to incoming customer orders for deviation from the forecast, confirms sales orders, and plans allocation for constrained supply. The functionality of order confirmations helps you to enforce planning by considering allocations to then generate order promises against customer orders.

For organizations that follow a frozen period ranging from a couple of days to a week, the response solution is relevant from the end of the frozen period to the end of the response solution horizon. For a frozen period of 1 week and a response solution period of 6 weeks, the horizon of response planning would be from 1 to 6 weeks. With no frozen period, the response solution horizon would be from the current date to the end of the response planning horizon.

Serving the customers optimally and responding to changing market realities against forecast is of prime importance. Therefore a response and supply solution becomes the central nervous system of the organization. All demands are not equal for an organization, and you may be required to follow a prioritization rule when fulfilling orders.

The figure shows an overall unified process flow and where Response Planning fits in.

The figure describes where in the SAP IBP process response planning does fit in.

Response Planning Process

Overview of the business process:

  • The Account Planner defines how demand shall be prioritized by defining specific prioritization rules.
  • The Account Planner then executes the Response Planning run that calculates a new supply plan, confirms sales orders according to the selected prioritization rule, and consumes product allocations.
  • After evaluating confirmations and analyzing gating factors, the Account Planner proceeds with resolving existing issues.
  • To do this, the Account Planner uses a scenario in which gating factors can be removed, for instance, by adjusting the existing product Allocations. All necessary simulations and reiterations can be executed in this scenario without changing the base planning version.
  • When the simulation results are satisfactory, the Account Planner promotes the scenario to copy the new adjusted Allocations to the base planning version. The product allocation can be used in Sales and distribution for ATP, which is discussed later in this chapter.
  • What-if analysis could also be done using the planning versions. Scenarios can also be created in these planning versions. The final result of this what-if analysis is then propagated to the planning version.
  • "Supply elements" and "Supply proposals" are used interchangeably, and they consist of Planned Orders, Stock Transfer Requisitions, and Purchase Requisitions.
The figure describes the planning process.

As shown in the figure, Response Planning considers Forecast, Sales Orders, fixed demands, and receipts (and safety stock) as Demand Elements.

Supply Elements created are Planned orders, STRs, Purchase Requisitions. Allocations are considered as a constraint and Sales orders are also considered, as opposed to Supply Planning with Allocation Creation Run.

To summarize:

  • One big difference compared to the Supply Planning with Allocation Creation run is, that in the Response Planning run Sales orders are considered as demand
  • The other difference is that Allocations can be considered as a constraint during the Response Planning run

While the Response Planning run in SAP IBP for response and supply is the basic planning run to plan the sales orders, it also considers open forecasts, fixed requirements, and receipts (stock) from execution and safety stock. When necessary, multi-level receipts are created, considering different valid sources of supplies available. Constraints considered in Response Planning are Resource Capacities, Supplier Commit quantities, Material availability and lead time, Product Allocations. Additionally, Response Planning creates new confirmation proposals for sales orders.

Response Planning (Also Known as Supply Planning with Order Confirmation Run)

In addition to creating the initial plan, you can also respond to changes and update the plan at any time for any unforeseen changes.

  • Whenever a supply or demand change occurs, you can use simulations to experiment with all the potential solutions
  • Will you reassign materials from an existing order to the high-priority customer?
  • Or get in touch with the factory and ask them to add an extra shift that week?
  • Once you have found the best solution in the simulation, you are provided with an instruction sheet. You or a relevant colleague can apply the changes to the order itself. The figure describes the response planning run.

Basics of Deployment Planning

The deployment run is one of the planning run types in order-based planning and is used to plan the distribution of available supply to demand.

The deployment feature resolves issues related to distribution in case there are any mishaps on the supply side. Any such shortcomings can be addressed using the deployment run, which essentially confirms the supply plan generated by the response engine.

As a prerequisite for the deployment run, we need to define the order categories that are Available-to-Deploy (ATD) in the ATD profile. With this as a reference, the deployment engine confirms the plan across the supply chain network, however, it cannot generate any planned orders.

Deployment Planning Process Description

Deployment planning is performed as short-term supply planning to distribute the available supply to demand.

The figure describes the Deployment Definition.

Step by Step Deployment Planning

Sales Orders, Forecast, Safety stock targets (static or time-dependent), and so on, are the inputs to Deployment Planning run. The following constraints are considered: product allocation, rules to segment and prioritize demand, Available to Deploy elements, min-max lot size, and rounding values.

The Priority Deployment Heuristic will plan individual demand elements, one by one. The planning algorithm selects the highest priority Source of Supply first. In case of shortage or lateness, secondary sources are used.

Planning run plans Distribution based on fixed production and procurement quantities. Deployment Stock transfers are only created if pegged supply is part of the ATD List. Optionally, you can create sales orders confirmations that help you to distinguish between sales and intercompany demand at a plant. Planning Runs cannot change fixed stock transfer orders or deliveries because SAP ECC or SAP S/4Hana is the master of these orders.

With the Pegging strategy "Stable Supply", you can preferably use firm supply for your high-priority demands. For example, Sales orders consume stock before Forecast does.

The figure describes the Deployment Step by Step.

Release Deployment Plan and Integrate with SAP S/4HANA

During the deployment run, the stock transfer requisitions that are pegged only to supply elements that are considered available to deploy become deployment stock transfer requisitions.

After integration to SAP S/4HANA, using the RTI outbound, you can convert these deployment stock transfer requisitions to stock transfer orders to prepare the execution of the supply plan.

The figure describes the Release of a Deployment Plan.

Deployment Status in SAP S/4HANA

  • SAP IBP-S/4HANA Integration cycle keeps the deployment status of Stock Transfer Requisitions consistent in both systems.
  • In automatic (mass) STR ->STO conversion user can schedule a job that converts only Deployment STRs into STOs.
  • Deployment status flag (what type of STR) can only be set by the interface. User cannot change the Type of STR manually in SAP S/4 HANA (that is, in transactions like ME51/ME52).
  • User can see the Deployment status flag in MD04.

Basics of Optimization in Order-Based Planning

The optimization was used in SAP IBP for a long time and currently utilizes "one code" specific features for different optimizers. The time-series-based optimizer has been enhanced to consider master and transaction data specific to order-based planning. In the Harmonized Planning Area, the existing algorithm, -> order-based optimizer, will continue to exist separately from the TS optimizer as it supports a separate process with different granularity and input data.

Optimizer can be used to support various processes in order-based planning.

The figure describes the Optimizer Capabilities.

Response Planning generates a coordinated plan that spans order fulfillment, order promising, and supply planning. Response Planning can be performed using the optimizer.

The second process is Supply and Deployment planning, with optimization being a major part. At that juncture, the focus is on achieving supply chain efficiency, improving inventory levels, minimizing lost sales, and respecting capacity instead of Response Management, where order fulfillment is the main goal.

The planning run writes order results and pegging when used in order-based planning. The optimizer transforms the supply model into a mathematical representation to find the cost-optimal solution.

For the optimizer, data is fed to the engine in buckets, using costs as a major input.

Costs are one of the major implementation efforts and their definition is the most critical to the success of the projects.

Cost Rules or Static Costs are included in the Planning Run Profiles.

Creating segments and assigning costs to different segment types is necessary for static costs.

The cost values in the Planning Run Profiles are abstract numbers representing proportions; they do not have any currency value.

If static and time-dependent costs are maintained, the optimizer will use more granular costs, that is, the time-dependent costs.

The results of the optimizer contain orders in addition to pegging. This is one of the main differences between the Order-Based Optimizer and the Time-Series Optimizer. With the pegging, we can create a bottom analysis: check the supply and see which primary demand is linked to that supply, or you could look at the demand and see which resource is fulfilling that demand.

When the optimizer run is complete, results can be seen in output key figures. Depending on business needs, a planner could use either the View Confirmations app, the View Gating Factors app, or the Analyze Supply Usage app.