The following section distinguishes between the overall S/4HANA project approach and the transition strategy for commercial agreements. The project approach (e.g. greenfield implementation, system conversion, or CCM scope extension) defines the system landscape and technical setup. In contrast, the transition strategy (e.g. hard cut, fade-out, or full migration) determines how existing commercial agreements and related data are handled during the transition. While the project approach sets the technical framework, it directly influences which transition strategies are feasible, meaning that not all options can be applied in every scenario.
Before go-live, it is essential to define the overall system and transition strategy. Different go-live approaches can be considered depending on the system landscape.
A greenfield implementation introduces CCM in a newly designed S/4HANA environment, allowing for optimized processes without legacy constraints. It allows organizations to fully leverage all available CCM functionalities from the outset without the need to align with existing data structures or processes.
In contrast, a system conversion integrates CCM into an existing landscape, requiring careful alignment with existing data and processes. CCM can be introduced in a limited form already in ECC and even go live prior to the system conversion. Alternatively, CCM can be implemented as part of the conversion and go live directly in the S/4HANA environment.
However, it should be considered that CCM on ECC provides only restricted functionality. Key features such as process variants, settlement variants, and distribution filter groups are not available, which typically requires additional adjustments and enhancements after the conversion to S/4HANA. As a result, implementing CCM directly in S/4HANA is often the preferred approach to avoid rework and to leverage the full capabilities of the solution.
When CCM is implemented in an ECC environment, relevant SAP Notes must be reviewed and applied to ensure system stability and correct functionality. These notes often include essential corrections and enhancements required for settlement processing.
Data migration plays a critical role in the transition. Depending on the system landscape, business requirements, and chosen implementation approach, different strategies can be applied, although not all strategies are feasible in every scenario.