发现公司管理
管理处理人队列
公司工具简介
管理费用类型和帐户代码
创建审计规则
维护汽车里程
维护受委托人配置
配置电子邮件提醒
配置清单管理
配置参加者
配置发票处理
使用地点”
修改打印的报告
维护税务管理
自定义 Concur Expense 专业站点
维护工作流
维护 Cognos 设置
创建测试用户
维护培训文档
配置差旅补助
配置站点设置

Processing Receipts Received

Objective

After completing this lesson, you will be able to create a query to process receipts.

Receipt Queries Overview

To acknowledge paper receipts for an expense report, use the Receipts Received setting. Enter the Report ID manually or scan the barcode from the Receipt Report. Only users with the Expense Receipt Processor role can use the Process Receipts tool.

The image displays the SAP Concur Processor page with the Receipts Received tab open. A panel shows Last Scan Information fields for Report ID, Report Name, Amount Claimed, Employee Name, and Receipt Container ID. Below, a New Scan section provides input boxes for Report ID and Receipt Container ID and a blue Process button. A second tab labeled Attach Receipts & View appears next to the active tab.

Create a Receipt Query

To scan a receipt report:

Steps

  1. From the Process Receipts page in the Expense application, scan the barcode at the top of the Receipt Report into the Report ID field. This is a required field.

    The image displays the SAP Concur Process Receipts page with the Receipts Received tab open. A panel lists Last Scan Information fields: Report ID, Report Name, Amount Claimed, Employee Name, and Receipt Container ID. The New Scan section shows the Report ID filled with C5050254482F49CC808E, a blank Receipt Container ID field, and a blue Process button.
  2. Enter the Receipt Container ID information into the Receipt Container ID field. This field may or may not be required by the scan configuration.

    The image displays the SAP Concur Process Receipts page with the Receipts Received tab active. A panel lists Last Scan Information labels for Report ID, Report Name, Amount Claimed, Employee Name, and Receipt Container ID. The New Scan section shows the Report ID filled with C5050254482F49CC808E, an empty Receipt Container ID field, and a blue Process button below.
  3. Select Process. The system's Receipts Received flag for that expense report is changed to reflect the new information. In addition, Last Scan Information is updated to reflect the report that was most recently processed. Based on the criteria designated within the Scan Configuration, the report you are scanning may contain alerts. If so, the alert will appear on the page.

    The image displays the SAP Concur Process Receipts page with the Receipts Received tab selected. A panel shows Last Scan Information labels for Report ID, Report Name, Amount Claimed, Employee Name, and Receipt Container ID. The New Scan section shows the Report ID filled with C5050254482F49CC808E and an empty Receipt Container ID field. A blue Process button is highlighted at the bottom left.
  4. Place the receipts into the designated receipt container, if applicable.

    The image displays the SAP Concur Process Receipts page with the Receipts Received tab open. The Last Scan Information shows Report ID C5050254482F49CC808E, report name CZECH REPORT, amount claimed 1,800.00 Czech koruna, employee name Jaron Manyama, and a blank receipt container ID. The New Scan section shows empty fields for Report ID and Receipt Container ID. A blue Process button appears at the bottom.

Summary

  • Use the "Receipts Received" setting to process paper receipts.
  • Input report information via barcode scan or manual entry.
  • Process receipts; update the "Receipts Received" flag and scan information.
  • Address any system alerts based on scan configuration.