The engineering department at the Forklifter Company manages changes to multiple objects using change numbers. Changes that have an impact on the production process require additional identification and control.
For this reason, the use of revision levels is considered.
Watch the following video to understand the purpose and usage of revision levels.
Revision level for Material BOMs
When you create a material BOM using a change number, you can decide whether a revision level should be assigned. If you later modify the BOM, you can also apply a revision level to document the change.
Watch the following video to understand how revision levels are used within a material BOM.
Assigning a revision level requires that an object management record exists for the corresponding object.
The use of revision levels and the required sequence logic must be activated in Customizing.
Revision level for Documents

The revision level is used to identify an important document version. A revision level can be assigned only while a document is being processed.
When you release a document with a change number for the first time, the system automatically assigns a revision level. When you display or process the document structure, you can view the revision level, but you cannot assign or change it there.
Revision levels for documents are defined in Customizing for document types.
Note
If revision levels are not defined, you can release a document version without a change number, even if an earlier version of the document was released using a change number.