To migrate data, create a migration project and assign one or more migration objects. The Migration Cockpit generates a staging table for each object within SAP S/4HANA Cloud. Once the staging table is filled and the guided migration steps have been completed, data is transferred to the SAP S/4HANA Cloud database.

Project setup options:
- Assign each migration object to its own project.
- Group related migration objects into a single project.
Consultants often split migration tasks by line of business area or divide objects equally across the team.
Watch a video
Watch this video on how to migrate data using staging tables with the SAP S/4HANA Migration Cockpit.
Guided Migration Procedure
The Migration Cockpit provides a structured, step-by-step approach to migrating your data. Following these steps ensures data integrity and a smooth transition to the new system.

The steps to migrate data are:
- Create a migration project.
- Select migration object(s) to assign to the project.
Note
Check each object's post-processing documentation to identify which app is needed for validation, and assign yourself the required business role. - Download migration object template (XML or CSV) and open in Microsoft Excel. Maximum upload size is 100MB (single file or compressed .zip).
- New to the Migration Cockpit? Use XML format and review the first two tabs for guidance on avoiding common errors.
- Experienced users may prefer CSV format, which omits the informational tabs and allows more data before reaching the 100MB limit. A video explaining how to work with CSV files is in the SAP Help Portal.
- The Migration Cockpit will only accept a maximum size of 100MB for a single file or .zip compressed file. You can compress a 160MB excel spreadsheet down to 100MB.
- Fill data in the template(s).
Note
When copy-pasting, always paste as Values Only or Text to strip formatting. Copied formatting will corrupt the file and prevent upload. - Upload the completed template(s) to the Migration Cockpit.
- Prepare the staging tables.
Note
Staging tables are generated per migration object to transfer data to SAP S/4HANA Cloud. - Process mapping tasks.
Note
Depending on the object, you may need to complete value mapping tasks (mapping source values to SAP HANA target values) and fixed value tasks (setting defaults for target fields). - Simulate the migration (optional).
Note
You can cancel the migration in both the Simulate and Migrate steps. - Migrate the data. The default number of concurrent migration jobs is 8; adjust in the Job Management area if needed. After migration, review results via the displayed link, which opens the relevant app for the migrated data.
- Create a correction file (optional) if errors are found during simulation or migration. Edit and re-upload the file to correct them.
- Close the project once all data for the object has been migrated. You can set a data retention period for the migrated data at this point.