Understanding Material Cost Estimate with Quantity Structure

Knowledge quiz

It's time to put what you've learned to the test, get 8 right to pass this unit.

1.

The explanation facilities enable the cost planner to access the master data directly from the cost estimate screen.

Choose the correct answer.
2.

The system uses the itemization of standard cost estimates to determine:

Choose the correct answer.
3.

The parameter key specifies which of the following functions?

There are two correct answers.
4.

The quantity structure control ID describes a list of priorities for the bill of material and routing through _____________________ and __________________________.

There are two correct answers.
5.

A routing can contain multiple materials involved in the same production process.

Choose the correct answer.
6.

TheĀ  work center describes the quantity of an activity and the location of the operations.

Choose the correct answer.
7.

Which parameters are required to create a costing run?

There are three correct answers.
8.

The costing run organizes the processing steps and checks the generated material cost estimates.

Choose the correct answer.
9.

Which of the following prices can you use to valuate the materials in the cost estimate?

Choose the correct answer.
10.

Which of the following material master views are relevant to costing?

There are three correct answers.