To create and release shop floor orders in SAP S/4HANA PEO, use either transactions CO01/ CO02 in the SAP Easy Access menu or the Create Production Order and Change Production Order visually harmonized UIs in the SAP Fiori launchpad.
- During the creation of a new shop floor order, you must specify the material, plant, and order type values as usual, and then select a production version if more than one is valid for the selected period of time.

The production version plays an important role in SAP S/4HANA PEO, as it not only defines that MBOM and routing are version controlled, but also which exact version of MBOM and routing will be picked for the production order. The production version name can be found in the Master Data view of the Create Production Order screen.

The details of the production version, especially the current valid version of the routing and MBOM, can be found in the Manage Production Versions app. You can change the production version details as long as the production version is not released.

After you have created, scheduled, and selected a production version for the order, an additional value appears in the Status field of the order header – MPE. The MPE status designates that this order is a shop floor order.

- In order to view the shop floor order later in the Manage Production Orders app, it is required to define the area of responsibility (AOR). AOR can be set as either production supervisor or work center. If you decide that your AOR is a production supervisor, then all orders must have the Production Supervisor value to be filled.
This can be done manually per each production order in the Assignments view of the Create/Change Production Orders app or per material in the Work Scheduling view of the MM01/MM02 transactions launched via the SAP Easy Access screen.


If you decide that your AOR is a work center, then all order operations must have a work center assigned to be viewed and managed in the Manage Production Operations app.
- Finally, to release a shop floor order, you can use the following options:
- Release the order in the standard CO01/CO02 transaction
- Release the order in the Manage Production Orders app
Summary
This lesson outlines creating and releasing shop floor orders using SAP Fiori apps in SAP S/4HANA PEO.
- Create and release shop floor orders in SAP S/4HANA PEO by selecting materials, defining production versions, setting responsibility areas, and releasing through SAP Fiori apps or standard transactions.