Conducting Final Quality Inspection

Objective

After completing this lesson, you will be able to verify rework by executing a follow-up visual inspection.

Second Video Inspection

The worker opens the Component Manufacturing Work Center POD using the Launchpad or the bookmark.

To start the second visual inspection, the worker opens the Component Manufacturing Workcenter POD.

The worker starts the SFC at the visual inspection operation and triggers the visual inspection. The status In Queue (RW) indicates that the system recognizes the SFC has been at this operation.

To start a 2nd visual inspection, the worker selects the SFC and operation and chooses the Start button.

The robot takes a picture and analyzes it to ensure the defect is resolved. SAP Digital Manufacturing analyzes the new image and verifies that all screws are accounted for and installed correctly. If the result is satisfactory, the system marks the part as "good."

The worker opens the visual inspection result by selecting the button in the POD. In the visual inspection result, they verify that the SFC is conformant and confirm this by selecting the button Conformant.

The SFCs inspection result is now conformant and the worker chooses the respective button.