Knowledge quiz

It's time to put what you've learned to the test, get 8 right to pass this unit.

1.

The system can carry out reduction measures in _____________ scheduling for orders.

Choose the correct answer.
2.

You can create parallel sequences in which of the following task lists?

There are two correct answers.
3.

A reference operation set allows for parallel and alternative sequences.

Choose the correct answer.
4.

You can use a scheduling margin key to define the floats before and after production in the material master record.

Choose the correct answer.
5.

If material requirements planning (MRP) is carried out without lead-time scheduling, it calculates capacity requirements.

Choose the correct answer.
6.

The in-house production time for a __________ can be calculated using lead-time scheduling.

Choose the correct answer.
7.

Which of the following can you assign to an operation in a reference operation set?

Choose the correct answer.
8.

Which of the following are possible reasons for alternative production methods?

Choose the correct answer.
9.

A product can have a maximum of 100 alternative bills of material (BOMs).

Choose the correct answer.
10.

When you display change master changes inside your routing, what kind of display options are available?

Choose the correct answer.