Knowledge quiz

It's time to put what you've learned to the test, get 8 right to pass this unit.

1.

Assembly scrap is used only when the material is an assembly.

Choose the correct answer.
2.

Plant is the main organizational element in production planning.

Choose the correct answer.
3.

MRP areas can be of the following types:

There are three correct answers.
4.

Identify the scrap calculation procedures supported by the system.

There are three correct answers.
5.

A new material type can be created by simply clicking New Entries and entering the data.

Choose the correct answer.
6.

What can you do using a trigger point?

There are two correct answers.
7.

Which of the following are required to be configured before you can create a BOM?

Choose the correct answer.
8.

Which of the following can be set in the user-specific settings?

There are two correct answers.
9.

When you plan to archive material master, what do you have to do?

Choose the correct answer.
10.

Which of the following can be used to influence the screen sequence of the material master record?

There are four correct answers.