Task Lists

Knowledge quiz

It's time to put what you've learned to the test, get 8 right to pass this unit.

1.

Any material component that you do not assign to an operation in the routing will, by default, be allocated to the first operation.

Choose the correct answer.
2.

You can use user-defined fields to assign data fields to an operation or suboperation for information purposes only.

Choose the correct answer.
3.

Inside your SAP system, you can assign various production resource tools to an operation in a routing.

Choose the correct answer.
4.

You can store __________ production version(s) for different lot size intervals in the material master.

Choose the correct answer.
5.

Which of the following is a method of creating routing material assignments?

There are two correct answers.
6.

Which of the following are ways of making changes to routings in SAP ERP?

Choose the correct answer.
7.

Component allocation to an operation is the only additional information that can be entered with regard to components.

Choose the correct answer.
8.

A where-used list can show you the task lists that will be affected by a change in a work center.

Choose the correct answer.
9.

More than one bill of material (BOM) can have components allocated to the same routing.​

Choose the correct answer.
10.

When suboperations are used, costing is automatically performed at operation level regardless of the control keys.

Choose the correct answer.