Knowledge quiz

It's time to put what you've learned to the test, get 8 right to pass this unit.

1.

It is not possible to make mass changes to routings using an engineering change management (ECM) number.

Choose the correct answer.
2.

Which of the following is a method of creating routing material assignments?

There are two correct answers.
3.

Which master data are part of a production version?

There are two correct answers.
4.

A where-used list can show you the task lists that will be affected by a change in a work center.

Choose the correct answer.
5.

Which of the following controls the engineering workbench (EWB)?

Choose the correct answer.
6.

You can assign each item in the bill of material (BOM) to only one operation in the routing.

Choose the correct answer.
7.

Suboperations can be used for more detailed capacity planning and costing.

Choose the correct answer.
8.

More than one bill of material (BOM) can have components allocated to the same routing.​

Choose the correct answer.
9.

The cockpit is used to display the hierarchical relationship of objects in the overview screen.

Choose the correct answer.
10.

You can store __________ production version(s) for different lot size intervals in the material master.

Choose the correct answer.