Purpose
You choose this processing method if the BOM of the material that was configured in the sales order is to be changed on a customer-specific basis. In the Sales Order screen, assign values to the characteristics.
Under AVC, the BOM is also exploded here. If available and set appropriately, it can be configured on multiple levels. If available and set appropriately, you can do an engineer-to-order (ETO) process.
Under LO-VC, in the standard process, the BOM is not exploded. The BOM components are not dependent until the order BOM is processed determined by the characteristic value assignment. Without a BOM, you can also configure only one level first. However, under LO-VC, there are also deviations from this standard. Using a special flag (maintenance in order allowed), a BOM explosion can be reached. A multilevel configuration is then also possible.
Prerequisites
The configuration profile of the configurable material specifies the "order BOM" process with BOM explosion.
Create a sales order, and enter the configurable material as an order item.
You see the configuration editor, where you assign values to the characteristics of the material.
As you enter characteristic values, dependencies for the characteristics and values are processed.
Under AVC: Bill of Material is exploded in the sales order. Under LO-VC, we do not have a BOM in the sales order. (This is standard under LO-VC. We also have a BOM explosion under LO-VC, if you use flag "maintenance in order allowed".)
If you have a BOM explosion in the sales order, characteristics can be subordinate configurable materials that are not valuated in the sales order.
The header material appears as a sales order item.
You can also create an order BOM for a quotation.
Procedure:
If you've created a sales order, process the Order BOM using special apps or transactions. In these apps and transactions, explodes the entire structure of the order BOM. You can assign subordinate configurable assemblies.
Under AVC, you can also change the configuration of header material.
In the technical clarification, you define which assemblies must be changed and which new assemblies are required.
You can make the following changes to an order BOM:
Change BOM items (such as B. quantity); insert items; delete items;
Copy items; Cut items; Replace class items manually in LO-VC.
Under LO-VC only: Result-oriented order BOM:
If you set this indicator, the configured order BOM is saved with all manual changes.
If you do not set this indicator, the super BOM is saved with all manual changes and object dependencies (selection conditions and procedures). When you call the BOM, the selection conditions are processed automatically and only the selected items are displayed.
Under LO-VC only: Automatic fixing:
If this indicator is set, you can use the maintenance function to save an order BOM, even if no changes are made to the BOM.
If this indicator is not set, an order BOM is only created if you make manual changes to the BOM.
Under LO-VC only: Maintenance allowed in Sales Order
The Maintenance in order allowed indicator allows you to go to the engineering view without leaving sales order maintenance.
In the sales order, you see a button labeled Engineering:
This means that the assigned values are temporarily fixed.
The BOM can be exploded.
You can do a multilevel configuration.
You cannot maintain an order BOM in the sales order.
Additional possibilities under AVC:
There are two additional apps:
If engineer-to-order production is recognized as required in the sales order, then this sales order ends up in the "Order Engineering Worklist". From here, you can the engineering process.
You can change the configuration. You can create order BOMs. In the order BOMs, you can create, change, and delete items.
There's another app for managing existing order BOMs.