Defining Procedures with Reference Characteristics (Quantity and TimeChange)

Objective

After completing this lesson, you will be able to define procedures with reference characteristics (quantity and time change), change time and quantity with procedures.

Procedures in Material BOMs (Change Quantities with Reference Characteristics)

Reference Characteristic

Up to now, you have created the characteristics directly together with the characteristic values. Now you are considering referencing tables and fields of other master data in order to take advantage of these fields in the classification.

Watch the following video, which describes this scenario.

Procedure for a BOM Item

Watch the following video, which now shows the use of a procedure inside a BOM. A reference characteristic is used for it.

Procedure for an Operation in a Task List (With Reference Characteristic Change Times)

The previous video explained the use of a reference characteristic inside a BOM.

The following video explains the scenario inside a Routing.

Change the Component Quantity / Change Values in Operations (Reference Characteristics)

With selection conditions, you defined which Material BOM components or routing operations are selected or not.

Now, it could be necessary to change these objects you selected inside material BOM and routing. Therefore, you may access database fields and modify their values based on certain conditions.

Inside the first task of this simulation, you change the mass of your counterweight depending on length, width, and height, based on your configuration.

Inside your second task, you increase the labor time of the relevant operation to 30 min, if the mast height is large.

Log in to track your progress & complete quizzes