If your company purchases materials from external vendors, you can implement QM in Procurement to support your procurement processes for quality assurance purposes. You can implement QM in Procurement as "stand-alone" or together with quality inspections. As a "stand-alone component", you can use all procurement functions except those for processing goods receipt inspections. To process such inspections, you need the Quality Inspections which are implemented by activating an inspection type of lot origin 01 for a material in a plant.
Play the following video to learn about which functions are available when the Quality Planner activates the QM in Procurement setting in the material master.
Note
Due to technical reasons, the QM in Procurement setting is not plant-specific, but valid client-wide. Technically speaking, the respective field is defined in tableMARA
and not defined in table MARC
. Therefore, when enabling QM in Procurement, the respective functionality is automatically enabled in all plants. If you do not want to use the respective functionality in some plants, you must maintain the control key 0000 (No active functions) (available in the SAP standard customizing) or a similar, customer-specific, key in the QM view of the respective plants. For mass maintenance of QM in Procurement keys in the material master, transaction QI05
is available.The Application Consultant defines the QM control key in Customizing under Quality Management → QM in Logistics → QM in Procurement → Define Control Keys. This key determines which functions are active for quality management in procurement. It is also possible to activate more than one function in a control key.
When combining QM in procurement with the generation of inspection lots for inspection lot origin 01 (Goods Receipt for Purchase Orders), you can:
Inspect vendor goods upon receipt (goods receipt inspections)
Manage the posted goods in inspection stock
Note that, depending on the detailed settings of the QM Control Key, additional fields in the QM view of the material master (for example quality certificate type, required QM system, and so on) must be maintained. In other cases, additional master data records (for example the Quality Info Record Procurement, document info records, and so on) must be maintained before the respective process can be executed.
Furthermore, a required QM system can be defined on material level. When creating a purchase order, the system compares the supplier QM system to the required QM system of the material and blocks the creation of the purchase order if the required QM system of the material does not fit to the suppliers QM system.
To activate QM in Procurement, the Quality Planner performs the following steps:
- Change the QM View of a material master.
- Set the QM in Procurement Active indicator.
- Maintain a control key enabling the required functionality.